-
Q What CNC machining services do you provide?
A We offer 3-, 4-, and 5-axis milling, CNC turning (including Swiss turning), EDM, surface grinding, threading, and light assembly.
-
Q How do you ensure quality and protect my IP?
A ISO-driven QC with in-process checks, CMM inspection, FAI on request, material certs/CoCs; NDAs honored and secure file handling.
-
Q What finishes and secondary operations are available?
A Anodizing, chem film, passivation, plating, bead blast, powder coat, heat treatment, laser marking, thread inserts, and assembly.
-
Q Do you handle both prototypes and production runs?
A Yes, from one-off prototypes to batches of 10,000+ with scalable workflows and repeatability.
-
Q What are your lead times?
A Rapid parts in 2–5 business days; standard production in 1–2 weeks, with expedited options available.
-
Q Can your clinker conveyor handle high-temperature clinker? What is the maximum temperature it can withstand?
A Yes, it can. Standard models are capable of conveying high-temperature clinker in the range of 150–250°C. Customized models can handle temperatures up to 400°C.
-
Q What are the conveying capacity and distance of the clinker conveyor? Can it operate on an incline?
A The standard conveying capacity ranges from 50 to 1000 t/h. A single unit can achieve a horizontal conveying distance of up to 300 meters. Inclined conveying is also possible, with a maximum angle of up to 65°.
-
Q What is the procurement process? How long does it take from inquiry to delivery?
A Procurement process:
Consultation (requirement clarification) → Site inspection (if required) → Solution design & quotation → Contract signing → Manufacturing → Factory inspection → On-site installation & commissioning (if required) → Acceptance & delivery → After-sales service.
Production lead time:
· Standard equipment: 60–90 days
· Customized equipment: 75–120 days