l Mold design and fabrication: 25 to 35 days,
l Sample delivery: 35 to 45 days,
l Mass production lead time: 7 to 15 days (depending on order quantity).
l Standard MOQ: 5,000 to 10,000 pieces.
l Small trial orders may be negotiable on a case-by-case basis.
l Reference samples are available for review.
l Custom parts require mold fabrication before sampling.
l Available reports include: Material certification, dimensional inspection reports, salt spray test results, tensile test results, etc.
Common certifications include: ISO 9001 (Quality Management), ISO 13485 (Medical Devices), IATF 16949 (Automotive), ROHS, REACH, etc. (Please replace with the actual certifications held by the factory).